RE RoofingEstimate

Crawlable sample roofing estimate

Sample roofing estimate

A finished roofing estimate preview for contractors comparing roofing estimate template results before rebuilding a Word document. The sample shows known job scope, line items, margin, tax, warranty, payment terms, and acceptance fields.

Roofing estimate preview

Roofing estimate

RE-2026-0604

June 4, 2026 | valid through July 4, 2026

$11,352
CustomerJordan Lee
ContractorSummit Ridge Roofing
Roof22 squares | 6/12 pitch

Known job scope

Architectural asphalt shingle replacement
742 Cedar Point Drive, Dayton, OH 45402

Remove existing asphalt shingles, inspect decking after tear-off, install synthetic underlayment, drip edge, starter strip, architectural shingles, ridge vent, pipe boots, and site cleanup. Replace up to 3 sheets of decking included before change-order review.

Contractor contact

Summit Ridge Roofing
(555) 013-4490 | estimating@summitridge.example

Prepared by: M. Alvarez

Roof, material, labor, and disposal rows

CategoryDescriptionQtyUnitUnit costTotal
RoofTear-off existing asphalt shingles and inspect decking22sq$82$1,804
MaterialArchitectural shingles, underlayment, drip edge, starter, vents22sq$164$3,608
LaborInstall shingle system, flashing touch-ups, ridge vent, boots22sq$138$3,036
DisposalDumpster, haul-off, magnetic sweep, final site cleanup1allowance$740$740
MaterialDecking replacement allowance before change-order review3sheet$72$216

Warranty, payment terms, and acceptance fields

Warranty: 5-year workmanship warranty; manufacturer material warranty per product registration.

Payment: 40% deposit, 50% at material delivery, 10% at final walkthrough.

Estimate totals

Direct subtotal$9,386

Margin (18%)$1,689

Tax (7.25%)$277

Estimate total$11,352

Customer acceptanceCustomer signature / date
Contractor acceptanceContractor signature / date
Valid throughJuly 4, 2026